11/13/19 Olive AMPS 193; PMPS 152; +4.5=158

Olive & Paula

Member Since 2015
Yesterday. Caber Yr 2 Day 39. Construction Day 12

So glad Ollie stayed safe, put a can of food in her bowl for grazing. She claws at the door, she wants to be with people not by herself.

Late start today. Cabinet people were here, contractors here. Then I had to touch up a few spots on wall, vacuum the cabinets, got some lined will finish that Friday. Counter people will be here Friday to measure. Cabinet people coming back to do window, fix two drawers that don't clear handles on another when pulled out. Install my undermount cookbook holder. They changed 2 cabinets either on their own or by accident, either way they are real difficult for me to access. So have to find out what they can do about it. Probably will have to change where things were kept before.

Tomorrow I have a bunch of errands to do. Return some extra kitchen stuff I got, get things I need now. Pet food, banking for dad. Post office. The most important is get my hair cut, 2 weeks overdue and it's to long to fix it right.
 
Last edited:
Saw the pic of your new cabinetry yesterday and then forgot to post when I got waylaid! You've got great taste! Hickory is absolutely stunning. Having Tux in the pic in a drawer made me smile and remember when our kitchen was redone and the fun the furry kids had in the boxes and cabinets. :D
 
Exciting progress on the kitchen! Yep these kitties want to be where the action is..

Have a great evening Paula! Be safe Ollie!
 
Back
Top