10/2/19 Olive AMPS 157; +3.5=166; +5=150; PMPS 227; +6=133

Olive & Paula

Very Active Member
Yesterday. Caber 362

The little extra juice is still talking. Gotta wait it out.

She is climbing my leg for food and she has already eaten the entire cycle allotment and it's only 3.5 hrs into cycle. Super hungry this morming.

I've got to get to the store and start getting all the hardware stuff for kitchen. AND start emptying the cabinets and find a place to store it all for a couple of weeks.
 
More good luck with all the kitchen work, Paula. Hope it's a fun day. I just know it's going to be great looking when it's finally done.
Tina has also been extra hungry the last couple days. Let's play at the beach Ollie, while we contemplate the lagoon . . .
 
Ollie is having a good day at the beach while mama shops for hardware stuff. Hope you get all the supplies that you need and that Ollie surfs safely :bighug:
 
Nice cycle so far Ollie!
Good luck with your kitchen reno Paula! Are you working with a contractor who will deal with the subs or are you managing the whole thing?
 
Good for Olive! What a job for the kitchen, emptying everything and making sure you know where all your stuff is....:rolleyes:
BTW you're not the only one having problems with your SS! I lost the scaling numbers on the 1st row of my SS today; I just had blank colored cells so I re-entered them! At least my testing numbers are there! :)
 
Nice cycle so far Ollie!
Good luck with your kitchen reno Paula! Are you working with a contractor who will deal with the subs or are you managing the whole thing?

Sort of both. Guess you could say I am micromanaging. I have a contractor who is doing the demo, plumbing, electrical, painting the ceiling. He will have someone do the drywall. I found the woodworker and put him in touch with contractor to touch base on the timeline. I chose the floor company and he knows contractor so they are in touch, floor is already picked out. Although not sure who is ripping up the carpet and doing any sub floor replacement. I think the contractor is but I need to talk to him. I would like the carpet down as long as possible. Don't want to walk on plywood or have any cats spit up on the plywood. Counter top is all done by the stone company. I just got the handles for the cabinets, cuz I didn't like what he had.

Check out the ceiling fan with light I'm leaning towards. Then a few recessed lights.

https://gotothefactory.com/brand-26/sku-344258
 
Sort of both. Guess you could say I am micromanaging. I have a contractor who is doing the demo, plumbing, electrical, painting the ceiling. He will have someone do the drywall. I found the woodworker and put him in touch with contractor to touch base on the timeline. I chose the floor company and he knows contractor so they are in touch, floor is already picked out. Although not sure who is ripping up the carpet and doing any sub floor replacement. I think the contractor is but I need to talk to him. I would like the carpet down as long as possible. Don't want to walk on plywood or have any cats spit up on the plywood. Counter top is all done by the stone company. I just got the handles for the cabinets, cuz I didn't like what he had.

Check out the ceiling fan with light I'm leaning towards. Then a few recessed lights.

https://gotothefactory.com/brand-26/sku-344258
Oh I like that ceiling fan!
Can't wait to see pictures of your kitchen!
 
Wow Paula, it's all coming together! It's been fun living vicariously through you on this project! Really great choice on the fan!
Climb down Ollie, it's beach time today!
 
Back
Top