10/12 Spreadsheet question

Amy&Tibby

Member Since 2020
General Google Spreadsheet question: I've started a second tab on my spreadsheet, because I've switched meters from AT2 to Relion. However, when I open the file, the old AT spreadsheet is the one that shows first. I want the new Relion one to be the top spreadsheet. Is there a setting I'm missing? I also need to update my footer here.
 
Are you doing "Publish to the Web"? If so, there's a drop-down right above the green publish button that lets you pick what you want to publish - you can pick "Entire Document" to have both tabs publish. To make the Relion one first, I think you just need to drag it to the left (at the bottom of your google sheet). Hope that helps some or at least gets you close...

ETA - I just set my spreadsheet share settings to "Anyone with the link" (it's under share in the upper right) and the I copy the link to my signature. This is different then publish (I don't have to ever click publish doing it the "share" way)
 
I did drag it to the left, but it still brings up the AT2 spreadsheet first. Maybe it's just too new, like maybe the one with the most recent activity will be the one that starts to pop up first?
 
I did drag it to the left, but it still brings up the AT2 spreadsheet first. Maybe it's just too new, like maybe the one with the most recent activity will be the one that starts to pop up first?
Hmm, I don't know :/ Are you doing Publish or Share? I use "Share"? Also, I know some people just keep both meters on one tab - just insert a line between to say when you switched (you can look at mine as an example).
 
I just mean when I look at it at home, the AT2 one is on top, despite being the 2nd spreadsheet now. I wanted a new sheet because I got tired of scrolling. So lazy of me.
 
I can't see your Relion data. And you actually don't need to start a new tab, just put a blank line in the spreadsheet where you start the new meter, and write "start Relion meter" or something like that, then start the new meter after that. We can find someone to help you with formatting so that the colour changes work with the new meter.
 
Oh, I was just trying to fix my view, but I'll fix that now.

The new tab was for me and my desire not to scroll so far every time I give him a shot.
 
I think it's all fixed now. Could someone check that you can see my entire spreadsheet, AT2 and Relion data, please?
 
Back
Top